Construction & Development of Ganga Expressway (Group-1, Package- 18) an access-controlled Six Lane (Expandable to Eight Lane) Greenfield Expressway from Meerut to Pravagraj from km 70+000 to Km. 137+600 in the state of UP.
Construction of Indore-Ujjain Green Field (Access Control) 4 lane with paved shoulder project highway starting from Km. 0+000 near Pitar Parvat and terminating at Km. 48+100 (Simhastha bypass, Km. 2+600) on Hybrid Annuity Mode (HAM) in the State of Madhya Pradesh
7 Nos.
| Sr. No. | Name of the Contract | Client | Length | Project Cost in Cr. |
|---|---|---|---|---|
| 1. | Construction & Development of Ganga Expressway (Group-1, Package-18) an access-controlled Six Lane (Expandable to Eight Lane) Greenfield Expressway from Meerut to Pravagraj from km 70+000 to Km. 137+600 in the state of UP. | IRB / MRM | 67 | 1,731.63 |
| 2. | Improvement and Up-gradation to Four Lane with Paved Shoulder configuration from Existing Km. 0+000 to Km. 39+500 (Design Ch. (0+500) to Ch 40+342, Design length 40+842 Km) of NH-227A (near Mehruauna Ghat (UP - Bihar Border) to Siwan) in the state of Bihar on Hybrid Annuity Mode | MORTH | 41 | 719 |
| 3. | Six laning of existing 4-lane section from Gonde (km. 439.038) to Pimpri Sado (km. 459.905) section of NH-848 (Old NH-3) (Design length 19.712 km.) under NH (O) in the State of Maharashtra on Hybrid Annuity Mode | NHAI | 20 | 574 |
| 4. | 4 laning of Aligarh-Palwal Section from Km. 0.00 (Starting from junction of NH-34 Aligarh) to Km. 46.390 (Design Chainage) Package-I from (Khereshwar Junction-Kurana) of NH-334D, Including Khair & Jattari Bypass in the state of Uttar Pradesh on HAM mode under NH(O) Scheme | NHAI | 46 | 822 |
| 5. | Construction of Deoria Bypass from existing Km. 27.140 to existing Km. 46.780 (Design Km. 49.109) on NH-727A (Design length 21.969 Km.) to four lane with paved shoulder configuration under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh | MORTH | 22 | 588 |
| 6. | Major upgradation of Durg Railway Station of SECR on Engineering, Procurement and Construction (EPC) mode. | RAILWAY | - | 347.34 |
| 7. | Construction of Indore-Ujjain Green Field (Access Control) 4 lane with paved shoulder project highway starting from Km. 0+000 near Pirkar Parvat and terminating at Km. 48+100 (Simhastha bypass, Km. +6000) on Hybrid Annuity Mode (HAM) in the State of Madhya Pradesh | MPRDC | 48.10 | 1,089 |
| TOTAL | 244.10 | 5,870.97 | ||